1. A completed artificial tree, draped in
vines, with the forest mural underway in the background.

2. Painting the mudbank on the visitors’ side
of the exhibit.

3. The visitor pathway, with new wall "enclosing"
the exhibit space and faux forest floor surface partially complete.

4. Loy attaches artificial roots to a mudbank.
In the foreground, leaf patterns are stenciled onto the floor.
5.
The corner roots and mudbank complete. The floor is stained and
sealed with a subtle leaf debris pattern. The wall mural is complete
and sealed. The planter bed "islands" await soil
and tropical plants.

6. Completed mural, rotted stump and floor
in the smaller exhibit.

7. Just before installing soil and plants,
natural deadfall is moved into place.
8.
A large shift door separates the two exhibit rooms.
Back to top |